We are still living with below-average temperatures, and woke up to snow this morning. It melted by lunch, but it is still a long way from warm. All or part of the day has been cloudy most of the week, which really sucks when the only heat you have is the sun. I've spent the last week fixing leaky pipes, leaky toilets, and leaky sewer lines. Some of the problems are in areas still under construction. Some problems are with "temporary" lines (like most non-profits, "temporary" at Arcosanti can cover decades) that will be improved during future construction. Some were just poorly thought out right from the start. But it's job security. At the current rate that we are crossing things off vs. the rate things are being added on, we will have to expand the Lab Building just to have a place to store the maintenance department's to-do list.
Well, we have to run down to camp and get our stuff out of the cube we were going to be moving into before we got our cool new super-scoop apartment. We can't really take any pictures until the current resident leaves for Brazil on January 26th, so be sure to check back next weekend.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment